TAC – GEELONG

∞ 40kW SOLAR GENERATION SYSTEM∞
∞ tac-solar-roof^tac-solar-closeup^tac-solar-roof-and-bay∞
∞ Solar Generation Systems are being adopted by more organisations as a way to reduce their carbon emissions with a positive financial outcome.
Nuvo Group was engaged by JLL. Impact Investment Group and the Transport Accident Commission (TAC) to install an additional 40kW of Solar PV, in Geelong, on their sustainable office.
∞ End Client|Jones Lang Lasalle^Location|Geelong, VIC^Energy consumption per year|883,531 kWh/year^Trina Smart Gen2 Pro|153 X 260Wp^Energy Cost Savings per year|23.1%^Saving Over 10 years|$317,876^Tonnes CO2-e saved over 10 years|570^Energy Cost ($/year)|$159,093 (EXISTING)
$122,782 (SOLUTION)∞

∞ Geelong TAC is a 7-level commercial office building offering excellent A-Grade accommodation. The building is highly specified with quality services, ESD Principles, ongoing environmental upgrades and virtually no capital expenditure requirements. The building has achieved a 5 star NABERS Energy Rating with a self-assessed rating of 5.5 stars.

The intelligent design, from Nuvo Group, was chosen due to the DC optimised panels to ensure maximum output from the roof space available. This installation allow them to continue with the energy efficiency and environmental sustainability objectives set by the client and improve the high energy performance of the TAC building.

∞ Reduced peak load energy demand^Reduced carbon emissions^Reduced energy costs^Maintained & Monitored by Nuvo Group^Long term warranty^Generation Guarantee∞
∞ ∞
∞ ∞

Related Case Studies

 

McELLIGOTTS MACKAY

1OOKW SOLAR GENERATION SYSTEM

Read More...

MCELLIGOTTS LAVERTON

88KW SOLAR GENERATION SYSTEM

Read More...

MALMSBURY JUSTICE

EXPANSION PROJECT

Read More...

HOPKINS CORRECTIONAL

ARARAT PRISON REDEVELOPMENT

Read More...