∞ Nuvo Group were called to assist the The Avenue Hospital (131 beds, 8 Operating Theatres, owned by Ramsay Health) in Windsor with a flood in the basement caused by external circumstances.
The entire basement was 1 metre underwater including the main switchboard for all power requirements for the Hospital. Citipower were called immediately to isolate the mains supply at the sub-station to isolate the building.
∞ End Client|Ramsay Health Care^Location|Albert Road, Melbourne, VIC^Project value|$2m∞

∞ The Nuvo Group Disaster Recovery Plan was triggered. A key team of Nuvo staff was mobilised including senior electricians, planners, engineers and managers, to work with the hospital operations team to assess the critical state of the main switchboard and the hospital functionality. As the switchboard was completely submerged and steam affected, re-use of any component of the board was not an option and therefore the hospital had to be evacuated. The evacuation of 160 orthopaedic patients took over 12 hours and the required use of some 50 ambulances to move the patients to other hospitals within the Group.

Nuvo Group organised emergency generators for some essential supplies and worked closely with A-Line Group to commence the removal and re-building of the main switchboard with materials flown in from Singapore and Sydney. Teams worked around the clock over a nine day period to meet a tight schedule and re-establish power to the Hospital. Ramsay Health was informed throughout via real-time status updates.

The final inspection and coordination with Citipower to re-instate the power was completed 24 hours ahead of schedule to allow the hospital preparation time prior to normalized operating conditions.

The Nuvo Group is called on every year to assist with Disaster Recovery incidents and planning at a variety of sites.∞

∞ ∞
∞ Critical Emergency call out response to a flood in a Hospital with power failure^Isolated main switchboard: submerged underwater^Worked with Hospital operations to evacuate over 160 patients from the Hospital^Coordinated emergency services and generators to supply power for essential services^Worked over 9 days straight over a 24/7 basis to remove and replace all main switchboard components^Real-time status reports to the client (Ramsay Health)^Critical re-establishment of the power back to the Hospital^Delivered 24 hours ahead of schedule∞
∞ ∞

Related Case Studies

 

ROBINVALE HOSPITAL

100KW SOLAR GENERATION SYSTEM

Read More...

KNOX PRIVATE HOSPITAL

EXPANSION PROJECT STAGE 2

Read More...

EPWORTH FREEMASONS

NEW AND REFURBISHED OPERATING THEATRES

Read More...

RATHDOWNE PLACE

AGED CARE APARTMENTS

Read More...

CABRINI HOSPITAL

CABRINI HOSPITAL MALVERN PLANT RE-LOCATION

Read More...